The job carried out was quite major involving generally three workers for a period of five weeks. It entailed removal and replacement of a rear patio, steps to the rear garden, a short length of path to the garden, paths round each side of the house, and the whole of the front drive. The front drive was finished in concrete block paving, the rear and side paths were done in sandstone as was the front doorstep and some pathways at the front of the house. The overall result is very pleasing and worth the inevitable disruption. The workforce were very impressive in terms of their general performance, the skill levels they exercised and flexibility in dealing with the inevitable problems that no one had thought of at the outset.
Best wishes
Bob Sleight